Final | 8/10/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Daryl Spivey
|
|
|
Call for correction fix before coming to jobsite to make sure it iscomplete. Phone #: ###-#### Inspection requested via web by James Paulin
|
Final | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | FAIL |
Daryl Spivey
|
|
|
Call Ken w/Vista Construction before inspection to set a time he can be there to make door is open. Ken''s # is ###-####. Phone #: ###-#### Inspection requested via web by James Paulin cannot install pex piping closer than 18 inches of water heater and need tempered water to hand sinks..........ds
|
Plumbing Rough-in | 7/20/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Eric Strole
|
|
|
Call Jim at ###-#### Phone #: ###-#### Inspection requested via web by James Paulin
|
CHANGE STATUS TO (I) | | | 7/10/2014 | | DONE |
Candy A. Nichols
|
|
|
sitll need inspections on fixtures
|
Water and/or Sewer | 7/2/2014 | 7/2/2014 | 7/2/2014 | P | PASS |
Eric Strole
|
|
|
Call before inspection Phone #: ###-#### Inspection requested via web by James Paulin
|
Issue PAID IN FULL permit | | | 7/2/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/2/2014 | | |
|
|
|
|
Application received | | | 7/2/2014 | | DONE |
|
|
|
This permit was created on the web by James Paulin
|
First Notice | 8/11/2014 | 8/11/2014 | | | |
Daryl Spivey
|
|
|
|
First Notice | 7/2/2014 | 7/2/2014 | | | |
Eric Strole
|
|
|
|