Final | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Walter
|
Plumbing Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 10/8/2014 | 10/9/2014 | 10/9/2014 | A | PASS |
Eric Strole
|
|
|
General is going to foam pipes and fur out walls as needed. I moved the pex 90''s closer to the "warm" side of wall to maximize insulation area. DWV on test. Phone #: ###-#### Inspection requested via web by Todd Walter-
|
Plumbing Rough-in | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | FAIL |
Eric Strole
|
|
|
if no there call and will tell you how to get in Phone #: ###-#### Inspection requested via web by Todd Walter-DWV test fail, missing nailplates in garage overhead and waterlines require 3 1/2 " of insulation to keep from freezing in garage overhead and waterlines in 2x4 wall need to be protected from freezing.
|
Issue PAID IN FULL permit | | | 10/7/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/7/2014 | | DONE |
|
|
|
This permit was created on the web by Todd Walter
|