Final | 8/24/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Jim Little
|
|
|
Air gap for softener has been installed, and VB has been added to bidet sprayer. Sorry for the delay. Lock box on site. Code is 3975 Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | FAIL |
Jim Little
|
|
|
Job is ready for inspection, final trim. Lock box on site. Code is 3975 if no one is on site. Thanks. Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell
1. provide cross connection control for sprayer on water closet or remove.
2. airgap softener drain
|
PLM-Aging Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PART |
Jim Little
|
|
|
wip
|
Plumbing Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Jim Johnson
|
|
|
Rough in is ready for inspection. Under test drains full of water, waters are live. Master bathroom, powder bathroom, downstairs bathroom, bar sink Phone #: ###-#### >> Inspection requested via web by Scott Sparrell
|
Issue PAID IN FULL permit | | | 3/11/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/11/2015 | | DONE |
|
|
|
This permit was created on the web by Scott Sparrell
|