Final | 10/21/2015 | 10/23/2015 | 10/23/2015 | A | PASS |
Bill VanDegrift
|
|
|
Steve Phone #: ###-#### cap of indirect waste in crawl and pipe water heater condensate to the ground water sump
|
Plumbing Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Eric Strole
|
|
|
Lacey Phone #: ###-####
|
Plumbing Rough-in | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | FAIL |
Eric Strole
|
|
|
Lacey Phone #: ###-####-Need to test DWV, Need to support DWV every 4", Missing nailplates, Need to finish vent.
|
Application received | | | 6/16/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/16/2015 | | DONE |
Christina Prado
|
|
|
|