Telephone call | | | 12/7/2017 | | DONE |
|
|
|
as per Juan @ Double A he only did ground work and rough in and a new plumber will pull new permit for the part they did. See permit that the other contrator pulled to finish job PLM17-04853
|
Permit EXPIRED | | | 12/7/2017 | | DONE |
|
|
|
as per Juan @ Double A he only did ground work and rough in and a new plumber will pull new permit for the part they did. See permit that the other contrator pulled to finish job PLM17-04853
|
PLM-Aging Inspection | 10/23/2017 | 10/23/2017 | 10/23/2017 | | PEND |
Bill VanDegrift
|
|
|
Juan is going to complete this project, it has been on hold.
|
(F) Reprint permit | | | 10/23/2017 | | DONE |
|
|
|
|
Case Summary (PLM) | | | 10/23/2017 | | DONE |
|
|
|
|
Fees Due Hold | 10/21/2017 | | 10/23/2017 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (I) | | | 10/20/2017 | | DONE |
Christina Prado
|
|
|
Change to issue for final trim per Bill V. Applicant must pay $55 re-instatement fee prior to inspections
|
Final | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | PASS |
Eric Strole
|
|
|
This was a rough-in only
|
Plumbing Rough-in | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 | P | FAIL |
Eric Strole
|
|
|
Juan Phone #: ###-####-Need to move hot waterline at w/h so they can get at least 3 1/2" of insulation behind on exterior wall.
|
(F) Reprint permit | | | 9/9/2015 | | DONE |
|
|
|
|
Water and/or Sewer | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PART |
Eric Strole
|
|
|
Sewer and water into building and stubbed up for future upstairs plumbing pass. Water service needs to be tied in to existing house still.
|
Water and/or Sewer | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | NR |
Eric Strole
|
|
|
|
Water and/or Sewer | 6/19/2015 | 6/22/2015 | 6/22/2015 | A | CANC |
Eric Strole
|
|
|
Juan Phone #: ###-####
|
Application received | | | 6/19/2015 | | |
|
|
|
|
Issue permit | | | 6/19/2015 | | DONE |
|
|
|
|