Final | 10/22/2015 | 10/23/2015 | 10/23/2015 | A | PASS |
Jim Little
|
|
|
Robert Phone #: ###-####
|
Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PART |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen >plumbing trim ok >sprinker backflow needs to be finished by sprinkler contractor for final.
|
Plumbing Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen
|
Plumbing Rough-in | 9/4/2015 | 9/8/2015 | 9/8/2015 | A | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Aarin Van Curen >1 DWV test failed-3 psi >2 Support pvc every 4' in crawl >3 wc and sh trap arm exceed max length per table 10-1 upc in master bath. >4 drain exit location different than sewer stub in location?
|
Issue PAID IN FULL permit | | | 9/4/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/4/2015 | | DONE |
|
|
|
This permit was created on the web by Aarin Van Curen
|