Final | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Jim Little
|
|
|
Ken Phone #: ###-####
|
Plumbing Rough-in | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PASS |
Jim Little
|
|
|
Ken Phone #: ###-####
|
Plumbing Rough-in | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | FAIL |
Jim Little
|
|
|
Ken Phone #: ###-#### >need to vent trap seperately, current point of vent with the wye puts to point of vent below the weir and creates an s trap. >905.5 vent pipe opening shall not be below the weir of the trap except on water closet's. >need test on dwv
|
Final | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | CANC |
Jim Little
|
|
|
Ken Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/2/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
(F) Reprint permit | | | 10/2/2015 | | DONE |
|
|
|
|
Application received | | | 10/2/2015 | | |
|
|
|
|