Final | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Bill VanDegrift
|
|
|
Vent for boiler under 5#test, back flow tested and fixtures all caulkrd. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 3/7/2016 | 3/7/2016 | 3/7/2016 | A | CANC |
Eric Strole
|
|
|
Boiler vent is under test, backflow has been inspected and all fixtures are caulked. Reinspection please. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell Inspection cancelled from web by: Scott Sparrell
|
Final | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | FAIL |
Eric Strole
|
|
|
Final inspection for whole house. Ready in afternoon. Phone #: ###-#### Inspection requested via web by Scott Sparrell-Need to test RPBA, finish caulking all fixtures and need to test pvc flue on tankless.
|
Plumbing Rough-in | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Daryl Spivey
|
|
|
Hasib Phone #: ###-####
|
Plumbing Rough-in | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PART |
Daryl Spivey
|
|
|
Hasib Phone #: ###-#### water ok....... waste failed....correct venting on tub and washer drain upstairs.........ds
|
Issue PAID IN FULL permit | | | 10/23/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/23/2015 | | DONE |
|
|
|
This permit was created on the web by Scott Sparrell
|