First Notice | 1/22/2016 | 1/22/2016 | 7/1/2016 | | DONE |
Eric Strole
|
|
|
|
Print Statement | | | 7/1/2016 | | DONE |
|
|
|
|
Final | 1/22/2016 | 1/22/2016 | 1/22/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Final | 1/15/2016 | 1/19/2016 | 1/19/2016 | A | PART |
Eric Strole
|
|
|
DBCA on premis protection is not approved in the vertical and need a dbca on ice tea maker. Temp final ok.
|
Final | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 12/2/2015 | 12/3/2015 | 12/3/2015 | P | CANC |
Jim Little
|
|
|
Phone #: ###-#### >> Inspection requested via web by Raul Castanon Inspection cancelled from web by: Raul Castanon
|
Plumbing Rough-in | 12/2/2015 | 12/3/2015 | 12/2/2015 | A | CANC |
Jim Little
|
|
|
|
Plumbing Rough-in | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Groundwork | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Eric Strole
|
|
|
Flat drain lines fixed and we removed the water test, hope that was ok, there was no correction on that part. Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Groundwork | 11/15/2015 | 11/16/2015 | 11/16/2015 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Need to fix all flat and backgraded dwv.
|
Issue PAID IN FULL permit | | | 11/15/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/15/2015 | | DONE |
|
|
|
This permit was created on the web by Raul Castanon
|