Final | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Eric Strole
|
|
|
8:oo AM Please call ahead for access, 15min if possible - Adam Phone #: ###-####
|
Final | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | FAIL |
Eric Strole
|
|
|
Please call ahead for access, 15min if possible - Adam Phone #: ###-####-Need to drill hole in T&P line. Need to caulk all fixtures and need to strap dishwasher discharge up under sink.
|
Plumbing Rough-in | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Eric Strole
|
|
|
adam Phone #: ###-####
|
Final | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PART |
Eric Strole
|
|
|
Need to nailplate and run T&P.
|
(F) Reprint permit | | | 3/22/2016 | | DONE |
|
|
|
|
Other | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | DONE |
Eric Strole
|
|
|
Conferance on DWV
|
Other | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | CANC |
Eric Strole
|
|
|
conference, would like call ahead; Adam Phone #: ###-####
|
Groundwork | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PASS |
Eric Strole
|
|
|
would like call ahead; Adam Phone #: ###-####
|
Groundwork | 2/1/2016 | 2/3/2016 | 2/3/2016 | P | DONE |
Eric Strole
|
|
|
would like call ahead; Adam Phone #: ###-####-Conferance on dwv
|
Issue PAID IN FULL permit | | | 12/11/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
(F) Reprint permit | | | 12/11/2015 | | DONE |
|
|
|
|
Application received | | | 12/11/2015 | | |
|
|
|
|