Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Eric Strole
|
|
|
|
Final | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | CANC |
Eric Strole
|
|
|
|
Final | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PART |
Eric Strole
|
|
|
AB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need tempering valves at wash basins. Need a shut off valve that shuts off the water heater only. All backflows need tested.
|
Plumbing Rough-in | 1/22/2016 | 1/25/2016 | 1/25/2016 | A | PASS |
Daryl Spivey
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Issue PAID IN FULL permit | | | 1/6/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/6/2016 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|
First Notice | 3/8/2016 | 3/8/2016 | | | |
Eric Strole
|
|
|
|