Final | 5/23/2016 | 5/25/2016 | 5/26/2016 | P | PASS |
Eric Strole
|
|
|
I would like to final out the plumbing. call ###-#### Phone #: ###-#### Inspection requested via web by George Karcher
|
Fees Due Hold | 3/4/2016 | | 5/23/2016 | | DONE |
Christina Prado
|
|
|
|
Plumbing Rough-in | 2/11/2016 | 2/11/2016 | 2/11/2016 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Eric Strole
|
|
|
Eric, We have some more industrial waste lines on static test. You can come out anytime today if you like. ###-#### Phone #: ###-#### Inspection requested via web by George Karcher-Sections on test pass. Need to fix backgrade on 2" trap arm.
|
Plumbing Rough-in | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PART |
Eric Strole
|
|
|
Call ###-#### or cell ###-#### Phone #: ###-#### Inspection requested via web by George Karcher-Looked at I/w lines.Test ok. BLD is not issued.
|
Application received | | | 1/30/2016 | | DONE |
|
|
|
This permit was created on the web by George Karcher
|
First Notice | 5/26/2016 | 5/26/2016 | | | |
Eric Strole
|
|
|
|