First Notice | 2/23/2016 | 2/23/2016 | 11/9/2016 | | DONE |
Eric Strole
|
|
|
|
Final | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson
|
Plumbing Rough-in | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson 1) I passed the water, waste and rain water system tests 2) provide a plumbing plan showing the type and locations of the fixtures installed
|
Issue PAID IN FULL permit | | | 2/12/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 2/12/2016 | | |
|
|
|
|
Application received | | | 2/12/2016 | | DONE |
|
|
|
This permit was created on the web by robert goodson
|
Telephone call | | | 2/12/2016 | | DONE |
|
|
|
called Rob to see if the plumbing permit was all underground since it was attached to the grading permit-he said no it should be attached to the building permit-i detached from GRD and attached to BLD
|