First Notice | 11/21/2016 | 11/21/2016 | 2/6/2018 | | DONE |
Daryl Spivey
|
|
|
|
PLM-Aging Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | | PASS |
Daryl Spivey
|
|
|
|
Final | 11/21/2016 | 11/21/2016 | 11/21/2016 | A | PASS |
Daryl Spivey
|
|
|
Ground work complete..........some above ground inspections done on this permit but should have been called in on permit PLM16-02771.........ds
|
Plumbing Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2nd floor Myrtle wing water tested ok..........ds
|
Plumbing Rough-in | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial 2nd floor Myrtle wing waste and vent only..........ds
|
Plumbing Rough-in | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1st fl. west end restroom roughed in and piping up and thru 2nd floor tested ok to floor level..............ds
|
Other | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | DONE |
Chad Schwendiman
|
|
|
3:30 ish call Keith first ###-#### talk about gas piping options - I meet with ESI, the architect, and engineer to discuss the routing of the gas piping for decritive appliances on the front patio. They are going to penetrate the exterior of the building above grade on the capital street side of the building and then run underground to the location of the appliances.
|
Other | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | CANC |
Bill VanDegrift
|
|
|
|
Groundwork | 5/31/2016 | 6/1/2016 | 6/1/2016 | P | PART |
Daryl Spivey
|
|
|
IN THE EARLY AFTERNOON PLEASE. KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER G/I piping and interceptor filled and tested ok.........ds
|
Plumbing Rough-in | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.....tested ok......ds Drains and sanitary on east side under floor
|
Storm Drains | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER roof drains west side........marked on plan..........ds
|
Groundwork | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | CANC |
Bill VanDegrift
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER wrong job
|
Groundwork | 4/22/2016 | 4/25/2016 | 4/25/2016 | A | PART |
Daryl Spivey
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water service lines to meter tested ok.........ds
|
Water and/or Sewer | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | NR |
Jim Little
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >no inspection needed per Keith
|
Groundwork | 2/22/2016 | 2/23/2016 | 2/23/2016 | P | PART |
Bill VanDegrift
|
|
|
KIETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER east side interceptor and venting, upstream piping to interceptor and sewer and water services to 15 fett out side of the riser room, no waste piping inside of the riser room yet.
|
Issue PAID IN FULL permit | | | 2/17/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/17/2016 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|