Final | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Jim Little
|
|
|
Jim, toilet, utility sink, floor drain in the aux. bldg functional ; ready for final inspection. I decided not to connect the sink in the half-bath. Request your final inspection . Thank you. Jacqueline Manderscheid Phone #: ###-#### Inspection requested via web by Jacqueline Manderscheid >only wc and utility sink set at time of final, homeowner says she is not doing the lav or floor drain.
|
Plumbing Rough-in | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Jim Little
|
|
|
Jacqueline Phone #: ###-#### >crawl space ri ok
|
Plumbing Rough-in | 3/15/2016 | 3/16/2016 | 3/16/2016 | P | PART |
Jim Little
|
|
|
Jacqueline Phone #: ###-#### >aux bld ri ok >crawl space corrections still need to be inspected
|
Plumbing Rough-in | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | FAIL |
Jim Little
|
|
|
Jacqueline Phone #: ###-#### >both cleanouts at sinks leaking, fix and retest
|
Water and/or Sewer | 3/4/2016 | 3/4/2016 | 3/4/2016 | P | FAIL |
Jim Little
|
|
|
EXTEND waste piping inside existing auxiliary building, CHANGE supply piping inside building from 1/2'' to 3/4'', ADDED tixtures: toilet, floor drain, bathroom sink CHANGED fixture to barn sink below window UNDERGROUND and rough-in inspection on test today.Jacqueline Phone #: ###-#### Inspection requested via web by Jacqueline Manderscheid CRAWL SPACE: 1.hang every 4 feet 2. grade 1/4" per foot 3. use approved glue 4.install 4" c/o 5. test @ 5 psi AUX BLDG: 1. transition glue not approved in bldg 2. grade 1/4" per foot 3. must be 6" above flood rim before turning horizontal 4. santee not approved ftg on wc vent 5. need full size c/o at upper terminal 6. test @ 5 psi 7. pex joints not approved under slab 8. retest water
|
Issue PAID IN FULL permit | | | 3/4/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/3/2016 | | DONE |
|
|
|
This permit was created on the web by Jacqueline Manderscheid
|