Final | 4/6/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Eric Strole
|
|
|
I called Suez after talking to Eric so they could install my meter and we can do a pressure check before the final inspection. I am calling them at 830 am to get an ETA and try and get them out before the inspector comes so I don''t have to cancel the inspection. I leave Friday for two months so I need to get it covered! The later the inspection the better for me. Phone #: ###-#### Inspection requested via web by Ivan Nanney-Waterline pass
|
Water and/or Sewer | 4/2/2016 | 4/5/2016 | 4/5/2016 | A | DONE |
Eric Strole
|
|
|
Wanted to cover the basics of my plan along with what materials are allowed/not allowed. Anything else I should know before beginning. Just want to make sure I do it all right the first time. ;) Phone #: ###-#### Inspection requested via web by Ivan Nanney-conferance on running a waterline.
|
Issue PAID IN FULL permit | | | 3/28/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/28/2016 | | DONE |
|
|
|
This permit was created on the web by Ivan Nanney
|