Final | 5/24/2017 | 5/25/2017 | 5/25/2017 | P | PASS |
Daryl Spivey
|
|
|
Todd Phone #: ###-####
|
Final | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PART |
Daryl Spivey
|
|
|
We are requesting a Plumbing and Hydronic piping final for the 2nd and 4th floors. The owner is seeking temporary occupancy of the facility involving these two floors. Early AM will be appreciated. Phone #: ###-#### Inspection requested via web by Val Hill 2nd and 4th floor occupancy ok. Backflows all tested ok..........ds
|
Other | 3/7/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Daryl Spivey
|
|
|
Inspection of boiler flue with templates and supports in place as requested. Phone #: ###-#### Inspection requested via web by Val Hill
|
Groundwork | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | PART |
Daryl Spivey
|
|
|
installation of a sump basin and floor sink in the fire pump room. drainage and vent under test. Also we need an inspection of the boiler flue verifying clearances as requested. Phone #: ###-#### Inspection requested via web by Val Hill ok to cover g/w. flue needs supported at each story with clearances and graded on horizontal run......ds
|
Plumbing Rough-in | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PART |
Daryl Spivey
|
|
|
todd Phone #: ###-#### gas tested ok at 30 lbs..........ds
|
Other | 12/13/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Daryl Spivey
|
|
|
Gas line pressure test. Phone #: ###-#### Inspection requested via web by Val Hill partial gas testfrom meter to about 20 feet inside......30 lb. test.........ds
|
Water and/or Sewer | 10/27/2016 | 10/27/2016 | 10/27/2016 | A | PART |
Daryl Spivey
|
|
|
Domestic water and DWV for the main floor and the basement areas. Rough-in ready for cover. Phone #: ###-#### Inspection requested via web by Val Hill 1st floor rough in ok.......ds
|
Plumbing Rough-in | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Daryl Spivey
|
|
|
Todd-mez & 3rd floor-waste and water Phone #: ###-####
|
Water and/or Sewer | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | CANC |
Daryl Spivey
|
|
|
re-established test for DWV levels 2 ; 3 Phone #: ###-#### Inspection requested via web by Val Hill
|
Plumbing Rough-in | 9/21/2016 | 9/21/2016 | 9/21/2016 | A | PART |
Daryl Spivey
|
|
|
re-established test for DWV levels 2 ; 3 Phone #: ###-#### Inspection requested via web by Val Hill restrooms on 2nd and 3rd floor tested ok to cover........ds
|
Water and/or Sewer | 9/18/2016 | 9/19/2016 | 9/19/2016 | A | NR |
Bill VanDegrift
|
|
|
DWV rough-in 2nd and third floors Phone #: ###-#### Inspection requested via web by Val Hill
|
Water and/or Sewer | 9/14/2016 | 9/15/2016 | 9/15/2016 | P | CANC |
Daryl Spivey
|
|
|
2nd floor water and DWV restrooms and associated areas. Phone #: ###-#### Inspection requested via web by Val Hill
|
Plumbing Rough-in | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PART |
Daryl Spivey
|
|
|
2nd floor water and DWV restrooms and associated areas. Phone #: ###-#### Inspection requested via web by Val Hill 2nd floor water ok....waste test failed.........ds
|
Water and/or Sewer | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PART |
Daryl Spivey
|
|
|
4th floor (Penthouse) DWV completed ; on test. Hydronic piping completed and on test. Ready for cover. Phone #: ###-#### Inspection requested via web by Val Hill 4th fl restroom ok for cover............ds
|
Water and/or Sewer | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PART |
Daryl Spivey
|
|
|
4th floor Penthouse domestic water piping for cover. Phone #: ###-#### Inspection requested via web by Val Hill water ok on penthouse area....ds
|
Other | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Daryl Spivey
|
|
|
Rain drain pressure test // Vale Phone #: ###-#### roof drains tested ok.......ds
|
Water and/or Sewer | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | CANC |
Daryl Spivey
|
|
|
under floor waste and vents in basement mechanical room and trench drain installation. Phone #: ###-#### Inspection requested via web by Val Hill
|
Groundwork | 6/8/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Daryl Spivey
|
|
|
under floor waste and vents in basement mechanical room and trench drain installation. Phone #: ###-#### Inspection requested via web by Val Hill
|
Water and/or Sewer | 5/16/2016 | 5/16/2016 | 5/16/2016 | A | PART |
Daryl Spivey
|
|
|
Hydronic piping test on 2nd floor. Phone #: ###-#### Inspection requested via web by Val Hill 2nd floor hydronics tested ok..........ds
|
Water and/or Sewer | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PART |
Daryl Spivey
|
|
|
DWV venting in basement for cover Phone #: ###-#### Inspection requested via web by Val Hill g/w tested ok for cover.......ds
|
Water and/or Sewer | 4/14/2016 | 4/18/2016 | 4/18/2016 | A | PART |
Daryl Spivey
|
|
|
Partial under slab DWV and Hydronic piping pressure test on 3rd floor Phone #: ###-#### Inspection requested via web by Val Hill partial underground in basement to interceptor ok.......turn vent on downstream side..........partial on hydronics on 3rd floor tested ok.........ds
|
Groundwork | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Daryl Spivey
|
|
|
Val-underground drainage Phone #: ###-#### main drain line for trench drains tested ok.........ds
|
Issue PAID IN FULL permit | | | 3/29/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
(F) Reprint permit | | | 3/29/2016 | | DONE |
|
|
|
|
Application received | | | 3/29/2016 | | |
|
|
|
|
First Notice | 5/25/2017 | 5/25/2017 | | | |
Daryl Spivey
|
|
|
|