Final | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Jim Little
|
|
|
Juan Phone #: ###-#### >flow control installed
|
Final | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PART |
Jim Little
|
|
|
Juan Phone #: ###-#### >Need paper work on grease incp. which most likely needs a flow control installed. >Temp occ ok
|
Final | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | NR |
Jim Little
|
|
|
Juan Phone #: ###-#### >no access
|
Plumbing Rough-in | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Bill VanDegrift
|
|
|
Please call ahead for access - Juan ###-#### waste line is 3" not four per the plans but it should work
|
Plumbing Rough-in | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | FAIL |
Jim Little
|
|
|
groundwork; Juan Phone #: ###-#### >need to pipe per approved plans >existing 2" floor sink will have to many fu dumping into it >strap pex in ceiling >ok to cover new gw behind bathroom
|
Application received | | | 4/15/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2016 | | DONE |
|
|
|
|
First Notice | 5/24/2016 | 5/24/2016 | | | |
Jim Little
|
|
|
|