First Notice | 2/28/2017 | 2/28/2017 | 3/2/2017 | | DONE |
Dan Ediger
|
|
|
This permit finaled on the web by Stacia Haumann
|
Final | 2/27/2017 | 2/27/2017 | 2/28/2017 | P | PASS |
Dan Ediger
|
|
|
If questions call Gary @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PART |
Dan Ediger
|
|
|
IF QUESTIONS CALL GARY @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann. Landscaper needs permit for double check and connection..
|
PLM-Aging Inspection | 1/5/2017 | 1/5/2017 | 1/5/2017 | | PEND |
Dan Ediger
|
|
|
|
Med/Gas Systems | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PART |
Bill VanDegrift
|
|
|
Med Gas Rough-In. If questions call Gary @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann sart dental gas test, air 150# vac 5.95# 4pmt
|
Plumbing Rough-in | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | CANC |
Bill VanDegrift
|
|
|
if questions call Gary @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann lookks like the ri I did Friday, no test on the air and vac systems
|
Plumbing Rough-in | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Bill VanDegrift
|
|
|
ri ok excludes med gas
|
Plumbing Rough-in | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | FAIL |
Bill VanDegrift
|
|
|
dwv test fail
|
Plumbing Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | CANC |
Bill VanDegrift
|
|
|
if questions call Gary @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann they will reschedule for Monday
|
Plumbing Rough-in | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | FAIL |
Eric Strole
|
|
|
rough-in water ; waste, if questions call Gary ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-DWV test fail, missing nailplates, need to be 6" above flood level rim before tieing vents together and san tee on vent in backwards.
|
Groundwork | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Jim Little
|
|
|
For any additional questions please contact Gary @ ###-####. Thank you, Holly Grago Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Issue PAID IN FULL permit | | | 5/2/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/2/2016 | | DONE |
|
|
|
This permit was created on the web by Stacia Haumann
|