DOC - Permit Finaled | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Jim Little
|
|
|
|
Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Jim Little
|
|
|
Add gas line to stove Phone #: ###-#### Inspection requested via web by Nick Drake >Please read for next time. G2417.1.4 (406.1.4) IRC Under no circumstances shall a valve in a line be used as a bulkhead between gas in one section of the piping system and test medium in an adjacent section, unless two valves are installed in series with a valved "tell-tale” located between these valves.
|
Issue PAID IN FULL permit | | | 5/9/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/9/2016 | | DONE |
|
|
|
This permit was created on the web by Nick Drake
|