Fees Due Hold | 6/11/2016 | | 1/19/2017 | | DONE |
Candy A. Nichols
|
|
|
permit was finaled by inspector without fees paid
|
PLM-Aging Inspection | 11/15/2016 | 11/15/2016 | 11/17/2016 | | PASS |
Dan Ediger
|
|
|
RP Certified
|
Sprinkler (Final) | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Dan Ediger
|
|
|
RP certified
|
Telephone call | | | 8/1/2016 | | DONE |
|
|
|
called Chad about fees due for reinspect fee-Chad said inspector sent him an email that the inspection passed. He's going to contact the inspector and I told him I'd send the statement out to him
|
Sprinkler (Final) | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | FAIL |
Jim Little
|
|
|
re -inspect >Otiker clamps not approved on water service, use two hose clamps. >re-inspection fee added, the next inspection will be the fourth trip. pat fee before next inspection.
|
Sprinkler (Final) | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | FAIL |
Jim Little
|
|
|
Charles Phone #: ###-#### >corrections not made >barbed ftg not inserted into water service completly >RP not certified >grade line from rp to meter tie in.
|
Sprinkler (Final) | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | FAIL |
Jim Little
|
|
|
Chuck Phone #: ###-#### >uncover complete tee at tie in >insert fitting is not pushed in all the way and leaking at tie in >line from backflow to drain must be graded to drain down >certify RPBA >each barbed ftg needs two clamps
|
Issue PAID IN FULL permit | | | 5/10/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/10/2016 | | DONE |
|
|
|
This permit was created on the web by Chad Vaughn
|