Final | 11/28/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Eric Strole
|
|
|
|
Final | 11/22/2016 | 11/23/2016 | 11/23/2016 | P | PART |
Eric Strole
|
|
|
Dan Phone #: ###-####-Need check and gate valve on ejector discharge.
|
Plumbing Rough-in | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | PASS |
Bill VanDegrift
|
|
|
gw ri ok
|
Plumbing Rough-in | 6/8/2016 | 6/9/2016 | 6/9/2016 | P | FAIL |
Bill VanDegrift
|
|
|
Daniel Phone #: ###-#### use directional fittings, no connection to closet bend, vent wc on shower arm, kitchen sink ok through sump because of structural conditions.
|
Application received | | | 6/8/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/8/2016 | | DONE |
|
|
|
|