Sprinkler (Final) | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Jim Little
|
|
|
Sprinkler DCVA inspection
|
Water and/or Sewer | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | FAIL |
Jim Little
|
|
|
backflow insp. >Need two hose clamps per connection >crimp clamps not approved. >plastic poly pipe must be 160 psi minimum. >need drain down valve ofter shutoff in ground >retest pvb after repairs and re inspect.
|
Issue PAID IN FULL permit | | | 6/21/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/21/2016 | | DONE |
|
|
|
This permit was created on the web by Dillon Simpson
|