Sprinkler (Final) | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Jim Little
|
|
|
Lincoln Phone #: ###-####
|
Sprinkler (Final) | 7/7/2016 | 7/8/2016 | 7/8/2016 | P | FAIL |
Jim Little
|
|
|
Lincoln Phone #: ###-#### >leak >must be 160 psi pipe up to DCVA >ok to backfill to pipe >recertify DCVA after new pipe is installed
|
Application received | | | 7/5/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/5/2016 | | DONE |
|
|
|
|