Final | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Jim Little
|
|
|
HABITAT NEW CONSTRUCTION PLUMBING FINAL TRIM Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Little
|
|
|
PLEASE COME LATER IN AFTERNOON. Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | FAIL |
Jim Little
|
|
|
JOB SUPER: PAUL Phone #: ###-#### Inspection requested via web by Chris Field >dwv test fail
|
Water and/or Sewer | 7/21/2016 | 7/22/2016 | 7/21/2016 | A | CANC |
Jim Little
|
|
|
SITE SUPER:PAUL, ###-#### ROUGH IN REINSPECT Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|
Plumbing Rough-in | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | CANC |
Jim Little
|
|
|
ROUGH IN REINSPECT AFTER CORRECTIONS. Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|
Plumbing Rough-in | 7/15/2016 | 7/18/2016 | 7/18/2016 | P | FAIL |
Jim Little
|
|
|
SITE SUPER: PAUL, ###-####. PLUMBING ROUGH IN Phone #: ###-#### Inspection requested via web by Chris Field >need to roll vent above centerline on tub and wc in o/head. >santee @ wc on main floor needs to be on vent not flange. >nail plate top of wall behind upstairs tub and cold to washer box on main floor. >3" trap to big for condensate, change to 2"
|
Issue PAID IN FULL permit | | | 7/15/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/15/2016 | | DONE |
|
|
|
This permit was created on the web by Chris Field
|