Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Davey
|
Final | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PART |
Dan Ediger
|
|
|
Will be open all day Phone #: ###-#### Inspection requested via web by Rod Davey. Need isolation valve on the softener feed line and an air gap, 1" minimum on the softener drain.. If the softener was installed by others a new permit is required by the installer.
|
Final | 10/3/2016 | 10/3/2016 | 10/3/2016 | P | NR |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Davey should have been for 3308 Acre
|
Plumbing Rough-in | 7/18/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Davey
|
Issue PAID IN FULL permit | | | 7/18/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/18/2016 | | DONE |
|
|
|
This permit was created on the web by Rod Davey
|