Other | 6/7/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Bill VanDegrift
|
|
|
10:00 AM
|
Final | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Bill VanDegrift
|
|
|
10:00 AM solar is flow through for hot water and radiant.
|
Final | 6/7/2017 | 6/9/2017 | 6/9/2017 | A | CANC |
Eric Strole
|
|
|
10:00 AM
|
Other | 6/7/2017 | 6/7/2017 | 6/7/2017 | A | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 5/30/2017 | 5/30/2017 | 5/30/2017 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 | | PART |
Eric Strole
|
|
|
No calls
|
Other | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Eric Strole
|
|
|
Radiant flr heating-100 psi test pass
|
Plumbing Rough-in | 8/3/2016 | 8/4/2016 | 8/4/2016 | P | PART |
Eric Strole
|
|
|
Carl Phone #: ###-####-Test needs to be a minimum of 100 psi. Ok to pour concrete as long as test is holding.
|
Groundwork | 8/1/2016 | 8/3/2016 | 8/3/2016 | A | NR |
Eric Strole
|
|
|
Anthony Phone #: ###-####-Not ready
|
Application received | | | 8/1/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/1/2016 | | DONE |
|
|
|
|