Final | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PASS |
Eric Strole
|
|
|
Call for access // Bill Phone #: ###-####
|
Plumbing Rough-in | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | FAIL |
Eric Strole
|
|
|
Jim Phone #: ###-####-San tee for vent on shower installed backwards.
|
Plumbing Rough-in | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | FAIL |
Eric Strole
|
|
|
Jim Phone #: ###-####-Still need to vent shower
|
Plumbing Rough-in | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | FAIL |
Eric Strole
|
|
|
Bill or Jim ###-#### Phone #: ###-####-Washer drain is required to be 2'. Need to fix backgrade on wash basin drain. Need to vent shower. Need to tent waterline feeding shower head in attic space. Need a shut-off valve that serves the water only.
|
Application received | | | 8/8/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/8/2016 | | DONE |
|
|
|
|