Final | 10/21/2016 | 10/21/2016 | 10/21/2016 | A | PASS |
Eric Strole
|
|
|
|
Final | 10/20/2016 | 10/20/2016 | 10/20/2016 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Walter -Will pass final upon inspection on interceptor. Temp final ok.
|
Final | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PART |
Eric Strole
|
|
|
Plumbing and gas piping. Phone #: ###-#### Inspection requested via web by Todd Walter-expose tempering valve for wash basin. Install rpba on dishwasher and install tether on all gas fired equip on wheels and install all equiptment.
|
Plumbing Rough-in | 10/2/2016 | 10/3/2016 | 10/3/2016 | A | CANC |
Daryl Spivey
|
|
|
gas piping inspection. Phone #: ###-#### Inspection requested via web by Todd Walter
|
Other | 10/3/2016 | 10/3/2016 | 10/3/2016 | A | PART |
Daryl Spivey
|
|
|
gas piping inspection. Phone #: ###-#### Inspection requested via web by Todd Walter partial on main gas line to roof top, water heaters and cook line...needs additional hanger on main over cooler..........ds
|
Plumbing Rough-in | 9/12/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Walter
|
Groundwork | 9/1/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Eric Strole
|
|
|
Could I get a late PM inspection Today as much as possible. Thanks Phone #: ###-#### Inspection requested via web by Todd Walter
|
Issue PAID IN FULL permit | | | 9/1/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 9/1/2016 | | |
|
|
|
|
Application received | | | 9/1/2016 | | DONE |
|
|
|
This permit was created on the web by Todd Walter
|
First Notice | 10/21/2016 | 10/21/2016 | | | |
Eric Strole
|
|
|
|