Water Heater Final | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | PASS |
Eric Strole
|
|
|
previously failed inspection due to air gap and shield - issue resolved. Customer request morning inspection as close to 8am as possible. please call 1/2 hour before arrival Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
Water Heater Final | 9/1/2016 | 9/7/2016 | 9/7/2016 | P | FAIL |
Eric Strole
|
|
|
Tankless water heater and water softener install Customer requests afternoon inspection. Please call 30 minutes before arrival. Janelle Byrd is the contact, Thank you Phone #: ###-#### Inspection requested via web by JEREMY LINK-Need an airgap at softner drain. Need insulation sheild on vent in attic space.
|
Issue PAID IN FULL permit | | | 9/1/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/1/2016 | | DONE |
|
|
|
This permit was created on the web by JEREMY LINK
|