Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by bob pond
|
Final | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PART |
Eric Strole
|
|
|
will be ready after 9:30 Phone #: ###-#### Inspection requested via web by bob pond-DBCA on premis needs tested. Need to add a rpba on froster. Temp occ ok.
|
Plumbing Rough-in | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by bob pond
|
Other | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | DONE |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by bob pond-Conferance on backflows that will be required.
|
Groundwork | 9/7/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by bob pond
|
Owner Supplied Equipment | | | 9/7/2016 | | |
|
|
|
|
Application received | | | 9/7/2016 | | DONE |
|
|
|
This permit was created on the web by bob pond
|
Issue PAID IN FULL permit | | | 9/7/2016 | | DONE |
|
|
|
|
First Notice | 10/31/2016 | 10/31/2016 | | | |
Eric Strole
|
|
|
|