Final | 1/5/2017 | 1/5/2017 | 1/5/2017 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Final | 1/4/2017 | 1/4/2017 | 1/4/2017 | A | PART |
Eric Strole
|
|
|
Need to hook up soap dispensor
|
Final | 1/3/2017 | 1/4/2017 | 1/4/2017 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore-Will go when road is plowed.
|
Final | 12/23/2016 | 12/23/2016 | 12/23/2016 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore-Need all equipment installed. Temp final ok.
|
Other | 12/21/2016 | 12/21/2016 | 12/21/2016 | P | PASS |
Eric Strole
|
|
|
Water heater PVC flue pipe pressure test. Phone #: ###-#### Inspection requested via web by Nels Moore-Test on flue pass
|
Plumbing Rough-in | 11/11/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Roof Drains | 11/11/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Other | 11/11/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Eric Strole
|
|
|
gas line pressure test Phone #: ###-#### Inspection requested via web by Nels Moore-60 lb gas test pass
|
Groundwork | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Groundwork | 10/6/2016 | 10/6/2016 | 10/6/2016 | A | PART |
Bill VanDegrift
|
|
|
Deep ground work Phone #: ###-#### Inspection requested via web by Nels Moore
|
Issue PAID IN FULL permit | | | 10/6/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 10/6/2016 | | |
|
|
|
|
Application received | | | 10/6/2016 | | DONE |
|
|
|
This permit was created on the web by Nels Moore
|
First Notice | 1/5/2017 | 1/5/2017 | | | |
Eric Strole
|
|
|
|