Final | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PASS |
Dan Ediger
|
|
|
if questions please contact Todd @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Dan Ediger
|
|
|
Please call Todd with an ETA ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | FAIL |
Eric Strole
|
|
|
If questions call Todd ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-Need to fix leak on shower trap arm.
|
Plumbing Rough-in | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | FAIL |
Eric Strole
|
|
|
if questions call Todd @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann-Need to be 6" above flood level rim before tieing horizontal vent into vertical vent. Cannot 45 2" p-trap up on horizontal wet vent and missing nailplates. Need to retest dwv section with correction.
|
Groundwork | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Bill VanDegrift
|
|
|
if questions call Todd @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Issue PAID IN FULL permit | | | 10/10/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/10/2016 | | DONE |
|
|
|
This permit was created on the web by Stacia Haumann
|