Final | 2/9/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Dan Ediger
|
|
|
Jason Phone #: ###-####
|
Final | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | FAIL |
Dan Ediger
|
|
|
Jason Phone #: ###-####. 1. Provide a 1" airgap at the water softener drains. 2. Run the water heater t&p drain to the outside of the building and drill a 1/16" hole in the lowest point of the drain. 3. Use a metal male x cpvc adapter at the t&p drain connection.
|
Plumbing Rough-in | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Dan Ediger
|
|
|
Larry-friend of Jason Phone #: ###-####. Backwater valve is not feasable.
|
Water and/or Sewer | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | DONE |
Eric Strole
|
|
|
Jason Phone #: ###-####-Conferance on dwv
|
Issue PAID IN FULL permit | | | 10/21/2016 | | DONE |
|
|
|
|
Application received | | | 10/20/2016 | | |
|
|
|
|