Final | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Final | 5/15/2017 | 5/16/2017 | 5/16/2017 | A | CANC |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | FAIL |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen. Provide an air gap at all T&p drains and grade to wh pan drains.
|
Plumbing Rough-in | 2/20/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Fees Due Hold | 11/8/2016 | | 11/10/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/7/2016 | | DONE |
|
|
|
talked to Brian-he pulled permit as commercial instead of multi family-so put in the fixtures for him and changed type of permit.
called him with the extra fees that are due
|
Groundwork | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Eric Strole
|
|
|
|
Groundwork | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Issue PAID IN FULL permit | | | 11/4/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/4/2016 | | DONE |
|
|
|
This permit was created on the web by Brian Johansen
|
First Notice | 5/23/2017 | 5/23/2017 | | | |
Dan Ediger
|
|
|
|