Final | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PASS |
Dan Ediger
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Meat department front: Hard pipe the feed to the chemical feeder with the air gap. Back side: Raise the spill resistant vacuum breaker to 6" above the chemical feed and have it certified.
|
Plumbing Rough-in | 1/5/2017 | 1/5/2017 | 1/5/2017 | A | PART |
Dan Ediger
|
|
|
OK to cover the new restroom walls.
|
Plumbing Rough-in | 12/27/2016 | 12/28/2016 | 12/28/2016 | A | CANC |
Dan Ediger
|
|
|
THIS CAN BE DONE DURING THE DAY, IT IS FOR THE RESTROOMS. MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA . DUMMER. Inspections on hold until the builder summits to the City of Boise for changes and corrections.
|
Groundwork | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | PASS |
Dan Ediger
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. New public bathrooms and one ada drinking fountain. Left a correction notice to the Bld superintendent to provide a complete set of changes for submittal
|
Other | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Dan Ediger
|
|
|
Met with K2 Mike Clay, job Super. Looked at the groundwork for thn two new back to back bathrooms and new drinking fountain. Buss to send pictures of the test.
|
Plumbing Rough-in | 12/8/2016 | 12/8/2016 | 12/8/2016 | A | PART |
Dan Ediger
|
|
|
top out of waste and water for the floral area.
|
Groundwork | 12/8/2016 | 12/8/2016 | 12/8/2016 | A | PART |
Dan Ediger
|
|
|
Combination waste and vent underground to the floral area.
|
Plumbing Rough-in | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | NR |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | NR |
Dan Ediger
|
|
|
Upper end of the combination waste and vent.
|
Plumbing Rough-in | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PART |
Dan Ediger
|
|
|
1/2" water line run overhead to the floral area. Vent for floral sinks.
|
Groundwork | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PART |
Dan Ediger
|
|
|
Floral area main tie-in and drain to upper terminal.
|
Plumbing Rough-in | 12/1/2016 | 12/2/2016 | 12/5/2016 | A | NR |
Dan Ediger
|
|
|
JOB WILL BE READY FOR INSPECTION AT 2:30AM. CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 12/1/2016 | 12/2/2016 | 12/5/2016 | A | NR |
Dan Ediger
|
|
|
JOB WILL BE READY FOR INSPECTION AT 2:30AM. CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | PART |
Dan Ediger
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Deli area floor sink and floor sink drains in the new north end center isle refrigerated displays.
|
Issue PAID IN FULL permit | | | 11/16/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/16/2016 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|
First Notice | 1/20/2017 | 1/20/2017 | | | |
Dan Ediger
|
|
|
|