Final | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Dan Ediger
|
|
|
solar hot water system // Carl Phone #: ###-####
|
Final | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PEND |
Dan Ediger
|
|
|
Anthony Phone #: ###-####. Met with the contractors and went over what needs to be completed for final. Remove pool return from the potable water line connecdtion
|
Final | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | NH |
Dan Ediger
|
|
|
Call half hour before to meet // Anthony Phone #: ###-####. Contractor to reschedule
|
Final | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | FAIL |
Dan Ediger
|
|
|
The pool and solar water must be seperated at the heat exchanger. The pool return is tied into the solar at the return, Install a vacuum relief valve at the high point of the system.
|
Final | 8/22/2017 | 8/24/2017 | 8/24/2017 | P | PEND |
Dan Ediger
|
|
|
Carl Phone #: ###-####
|
Final | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | FAIL |
Dan Ediger
|
|
|
carl Phone #: ###-####. 1. Provide specifications on the propress fittings showing the maximum temperature rating. 2. Add a vacuum relief valve at the roof piping. 3. Route the t&p piping from the water heater and solar storage tank to an approved receptor. The shower pan or add a trap and aav to the pipe next to the fau. 4. Install a check valve on the cold water feed to the water heater and storage tank. 5. Increase the cold water feed line to 1" or larger. 6. Label all the solar valves. 7. Give written instruction on how to winterize the system. 8. Install a dual wall heat exchanger at the pool and hot tub. 9. Provide a piping diagram of the thermal solar system. 10. The check valve on the 80 gallon wh needs to face up.
|
Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | FAIL |
Dan Ediger
|
|
|
Carl Phone #: ###-####. 1. Senser wire connection on the roof must be waterproof. 2. Water lines on the roof must be supported per code. 3. Pipe insulation must be rated at R-5 or grater. 4. T&P drains must run full size to 24" to 6" above grade. If two 3/4" are combined they must increase to 1-1/4". 5. T&P drains must be graded at 1/4"/ft. 6. Add a shut-off valve at the water heater next to the storage tank on the inlet side. 7. The cold water feed to the hot water heaters are undersized. Either provide unit fixture count and sizing or increase to 1" back to the water conditioner. 8. The solar panal piping must have a manual shut-off and draindown system. 9. Provide a seconday heat source or automatic draindown system to protect the potable water system at exposed locations. 10. The system must be complete and functioning. Install hot tub. Further corrections may apply after system design review. Please provide a system design to show how all potable water will be protected; including control function and winterization. This must be provided in writing.
|
Other | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | PART |
Bill VanDegrift
|
|
|
met Dan to go over the solar system. needs some work
|
PLM-Aging Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | PEND |
Dan Ediger
|
|
|
wip
|
Other | 1/24/2017 | 1/26/2017 | 1/26/2017 | A | PART |
Dan Ediger
|
|
|
Carl// prefers 9am Phone #: ###-####. Ok to cover. Pool piping and heat exchanger after snow melt
|
Application received | | | 12/9/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/9/2016 | | DONE |
|
|
|
|