Final | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Eric Strole
|
|
|
Randal Phone #: ###-####
|
Final | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PART |
Eric Strole
|
|
|
randall Phone #: ###-####-Temp final ok. Need to install and hook-up all equipment.
|
Other | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | DONE |
Eric Strole
|
|
|
conference // Randall Smith Phone #: ###-####-Conferance on backflows required
|
Other | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | DONE |
Eric Strole
|
|
|
Randall Phone #: ###-####-Conferance on grease interceptor
|
Plumbing Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Eric Strole
|
|
|
r/i for drinking fountain//Randall Phone #: ###-####
|
Groundwork | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Eric Strole
|
|
|
Randall Phone #: ###-####-Groundwork pass.
|
Plumbing Rough-in | 3/1/2017 | 3/1/2017 | 3/1/2017 | A | PART |
Eric Strole
|
|
|
should be ready about 9:00 Phone #: ###-#### Inspection requested via web by Randall Smith-Kitchen area pass
|
Groundwork | 1/31/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Eric Strole
|
|
|
Randall Phone #: ###-####
|
Groundwork | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | CANC |
Eric Strole
|
|
|
randall Phone #: ###-####
|
Other | 12/23/2016 | 12/27/2016 | 12/27/2016 | A | DONE |
Eric Strole
|
|
|
Conferance on sewer tap permit or not.
|
Other | 12/23/2016 | 12/23/2016 | 12/23/2016 | P | DONE |
Eric Strole
|
|
|
Randal Phone #: ###-####-Walk-thru
|
Application received | | | 12/23/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/23/2016 | | DONE |
|
|
|
|
First Notice | 6/1/2017 | 6/1/2017 | | | |
Eric Strole
|
|
|
|