PLM-Aging Inspection | 4/27/2018 | 4/27/2018 | 4/27/2018 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Dan Ediger
|
|
|
|
PLM-Aging Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | PEND |
Dan Ediger
|
|
|
Contractor to schedule
|
PLM-Aging Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 | | FAIL |
Dan Ediger
|
|
|
1. The t&p drain is backgrading. 2. Install a tempering valve on the water heater or at all public sinks. 3. The backflow needs to be certified. 4. The access to the backflow needs to be large enough to access the unions on the pipes for replacement and repair.
|
PLM-Aging Inspection | 7/28/2017 | 7/28/2017 | 7/28/2017 | | PEND |
Dan Ediger
|
|
|
contractor to schedule
|
Issue PAID IN FULL permit | | | 1/2/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/2/2017 | | DONE |
|
|
|
This permit was created on the web by chris thornburg
|