Final | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Bill VanDegrift
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER final ok
|
Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PART |
Dan Ediger
|
|
|
1. Provide an RP backflow at the scrap accumulator machines (2) or relocate the vacuum breakers to 6" above the critical level. 2. Provide an RP backflow preventor at the dishwasher heat exchanger if a single wall heat exchanger.
|
Final | 5/15/2017 | 5/16/2017 | 5/16/2017 | P | PART |
Dan Ediger
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Shorten hose on pre-rinse faucet or add a backflow preventer. Support horizontal air hammer arresters. recalled insprection for 5/17/17 to inspect equipment backflow protection.
|
Plumbing Rough-in | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Dan Ediger
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | PART |
Daryl Spivey
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | P | PART |
Bill VanDegrift
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER couple of floor sinks, piping in ceiling of the first floor, ok
|
Plumbing Rough-in | 3/21/2017 | 3/22/2017 | 3/22/2017 | P | PART |
Dan Ediger
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. In-wall dwv and water.
|
Issue PAID IN FULL permit | | | 1/10/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/10/2017 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|