CHANGE STATUS TO (FNL) | | | 5/3/2017 | | DONE |
|
|
|
|
Final | 1/13/2017 | 1/17/2017 | 1/17/2017 | A | CANC |
Dan Ediger
|
|
|
Adin Phone #: ###-#### - Plumbing contractor needed before inspection can be performed
|
Telephone call | | | 1/13/2017 | | DONE |
|
|
|
made contact with Adin about the fact that we cannot issue the plumbing permit to the parcel owner and notified that he will have to secure a plumbing contractor and have them contact us so that we can switch the permit over to their name
|
Hold | | | 1/13/2017 | | DONE |
|
|
|
made contact with Adin about the fact that we cannot issue the plumbing permit to the parcel owner and notified that he will have to secure a plumbing contractor and have them contact us so that we can switch the permit over to their name
|
Application received | | | 1/13/2017 | | |
|
|
|
|
Meeting | | | 1/13/2017 | | DONE |
|
|
|
as per Rita DeYoung - this permit is for the finish work on plumbing permit PLM16-01063
|
Issue PAID IN FULL permit | | | 1/13/2017 | | DONE |
|
|
|
|