Final | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Eric Strole
|
|
|
Randall-bldg 8-last to ADA rooms Phone #: ###-####
|
Final | 5/4/2017 | 5/4/2017 | 5/5/2017 | P | PART |
Eric Strole
|
|
|
ADA room too // Randal Phone #: ###-####-Building 5, 6, 7 ,10 final ok.
|
Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PART |
Eric Strole
|
|
|
Randall-building #8 Phone #: ###-####-Building 8 final pass.
|
Final | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | PART |
Daryl Spivey
|
|
|
Building 4 // Randall Phone #: ###-#### bld 4 is complete.......ds
|
Plumbing Rough-in | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PART |
Eric Strole
|
|
|
Building 8 // Randal Phone #: ###-####-Building 8 all r/i complete.
|
Final | 4/18/2017 | 4/19/2017 | 4/19/2017 | P | PART |
Eric Strole
|
|
|
Partial FInal for Bldg. 14 - Randall Phone #: ###-####-Building 14 final pass.
|
Plumbing Rough-in | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PART |
Eric Strole
|
|
|
for shower valves// Randall Phone #: ###-####-Buildind 7 rough-in pass.
|
Plumbing Rough-in | 4/16/2017 | 4/17/2017 | 4/17/2017 | A | PART |
Eric Strole
|
|
|
shower valves building 8 except 2 ada rooms Phone #: ###-#### Inspection requested via web by Randall Smith-Rough-in all units except ada units pass.
|
Final | 4/11/2017 | 4/12/2017 | 4/12/2017 | P | PART |
Daryl Spivey
|
|
|
Building 12 // Randall Phone #: ###-#### bld 12 ok
|
Final | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PART |
Eric Strole
|
|
|
Randall Phone #: ###-####-Building 11 final ok.
|
Plumbing Rough-in | 4/2/2017 | 4/3/2017 | 4/3/2017 | A | PART |
Eric Strole
|
|
|
shower valves building 12 and14 Phone #: ###-#### Inspection requested via web by Randall Smith-Building 12 & 14 rough-in pass.
|
Final | 3/27/2017 | 3/28/2017 | 3/28/2017 | P | PART |
Eric Strole
|
|
|
Randall Phone #: ###-####-Building 10 except ada unit final ok.
|
Final | 3/22/2017 | 3/22/2017 | 3/22/2017 | P | PART |
Eric Strole
|
|
|
330 if you can // ''Randall Phone #: ###-####-Building 9 final pass.
|
Plumbing Rough-in | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Eric Strole
|
|
|
Shower valve r/i, bldg 11 - Randall Phone #: ###-####
|
Plumbing Rough-in | 3/16/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Daryl Spivey
|
|
|
Randall Phone #: ###-####
|
Plumbing Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | A | PART |
Eric Strole
|
|
|
Building 9 & 1 r/i shower valves.-Building 9 rough-in pass. Building 10 rough-in except ada unit pass.
|
Water and/or Sewer | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | CANC |
Eric Strole
|
|
|
Randall Phone #: ###-####
|
Final | 3/12/2017 | 3/13/2017 | 3/13/2017 | A | PART |
Eric Strole
|
|
|
ready in morning bldg # 6 Phone #: ###-#### Inspection requested via web by Randall Smith-Final building 6 final ok except ada unit.
|
Plumbing Rough-in | 3/10/2017 | 3/13/2017 | 3/13/2017 | A | PART |
Eric Strole
|
|
|
Randall-ada room bldg 6 Phone #: ###-####-late pm if possible-ADA unit building 6 rough-in pass
|
Plumbing Rough-in | 3/10/2017 | 3/10/2017 | 3/10/2017 | P | NR |
Eric Strole
|
|
|
Randall-ada room bldg 6 Phone #: ###-####-late pm if possible-Not ready
|
Plumbing Rough-in | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Eric Strole
|
|
|
Building 5 // Randall Phone #: ###-####
|
Plumbing Rough-in | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PART |
Eric Strole
|
|
|
Building 6 showers // Randall Phone #: ###-####-Rough-in except ada unit pass.
|
Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PART |
Eric Strole
|
|
|
building 5 /// Randall Phone #: ###-####-Final ok except ada unit.
|
Plumbing Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PART |
Eric Strole
|
|
|
Building 4 ADA room // Randal Phone #: ###-####-Building 4 unit 411 rough-in pass
|
Plumbing Rough-in | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-####-building 4 unit 413 rough-in pass
|
Final | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PART |
Eric Strole
|
|
|
Building 4 // Randall Phone #: ###-####-Building 4 except ada units pass.
|
Plumbing Rough-in | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PART |
Eric Strole
|
|
|
Randall-shower values in building 5-please do not final until all buildings have been finaled Phone #: ###-####-Building 5 Rough-in except ada unit pass.
|
CHANGE STATUS TO (I) | | | 2/23/2017 | | DONE |
|
|
|
was finaled by mistake-several buildings included in this permit
|
Final | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | PASS |
Daryl Spivey
|
|
|
Building 3 final only - Randall Phone #: ###-####
|
Plumbing Rough-in | 2/15/2017 | 2/15/2017 | 2/15/2017 | A | PART |
Eric Strole
|
|
|
randall Phone #: ###-####-Building 4 rough-in ok except 2 ada units.
|
Final | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | PART |
Eric Strole
|
|
|
randall Phone #: ###-####-Building 2 final ok.
|
Final | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PART |
Eric Strole
|
|
|
Randall Phone #: ###-####-Need to install a dbca on each building and thermal expantion tanks. Building 1 Temp occ ok.
|
Plumbing Rough-in | 1/25/2017 | 1/25/2017 | 1/26/2017 | P | PART |
Eric Strole
|
|
|
Randall-shower valves Phone #: ###-####-Building 1-2 & 3 pass.
|
Application received | | | 1/25/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/25/2017 | | DONE |
|
|
|
|
First Notice | 5/9/2017 | 5/9/2017 | | | |
Eric Strole
|
|
|
|
First Notice | 2/17/2017 | 2/17/2017 | | | |
Daryl Spivey
|
|
|
|