Final | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Eric Strole
|
|
|
|
Other | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Eric Strole
|
|
|
Gas test-20 lb gas test pass
|
Final | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | NR |
Eric Strole
|
|
|
Elania Phone #: ###-####-Not ready
|
Final | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | FAIL |
Eric Strole
|
|
|
Elaina Berti Phone #: ###-####-Need Mechanical permit, gas test and run T&P to an approved location.
|
Plumbing Rough-in | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
Eric Strole
|
|
|
Groundwork and rough-in pass.
|
Plumbing Rough-in | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | NR |
Eric Strole
|
|
|
Not ready
|
Water and/or Sewer | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | CANC |
Eric Strole
|
|
|
|
Groundwork | 3/27/2017 | 3/28/2017 | 3/28/2017 | P | NR |
Eric Strole
|
|
|
Ellina Phone #: ###-####-Not ready
|
Other | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | DONE |
Eric Strole
|
|
|
Ellina Phone #: ###-####-Walk-thru on r/i.
|
Other | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | DONE |
Eric Strole
|
|
|
Conference - Elaina Phone #: ###-####-Conferance on DWV
|
Application received | | | 3/20/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2017 | | DONE |
|
|
|
|