Final | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | PASS |
Dan Ediger
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | PART |
Dan Ediger
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Add tempering valves at the two public lavatories, and gringer system test (electricians still wiring). All else ok.
|
Plumbing Rough-in | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 4/18/2017 | 4/19/2017 | 4/19/2017 | P | FAIL |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-####. THANKS. Phone #: ###-#### Inspection requested via web by BECCA DUMMER. DWV and water on the now bathroom ok to cover. 1. Increase the vent to meet cross sectional area. 2. Install a 1" double check valve for premise protection. 3. Increase the water size to 1" minimum below the existing gate valve and size the water system per plans. 4. Permanently remove the shower and remove plumbing where possible and permanently cap underground trap riser.
|
Other | 4/18/2017 | 4/19/2017 | 4/19/2017 | P | PASS |
Dan Ediger
|
|
|
1:30 Mark
|
Other | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | DONE |
Dan Ediger
|
|
|
THIS IS FOR A CONSULT THIS AFTERNOON. MARK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 3" stack to run outside below grade and tie-in in front of the 4" clean-out above the invert.
|
Groundwork | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Issue PAID IN FULL permit | | | 4/4/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/4/2017 | | DONE |
|
|
|
This permit was created on the web by BECCA DUMMER
|
First Notice | 5/5/2017 | 5/5/2017 | | | |
Dan Ediger
|
|
|
|