Water Heater Final | 5/5/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Dan Ediger
|
|
|
Please call Michael en route to inspection ###-#### -- Phone #: ###-#### Inspection requested via web by Erin Whiting
|
Water Heater Final | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | FAIL |
Dan Ediger
|
|
|
Please call Michael Kennedy ###-#### when in route Phone #: ###-#### Inspection requested via web by Erin Whiting. 1. Install the combustion air filter per installation instructions. 2. Install a 3" drip leg on the gas line per code. 3. Turn the t&p drain down to the floor.
|
Issue PAID IN FULL permit | | | 4/28/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/28/2017 | | DONE |
|
|
|
This permit was created on the web by Erin Whiting
|