Final | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Daryl Spivey
|
|
|
finish 24 hr test on G/I.......ds
|
Water and/or Sewer | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum start 24 hr test on G/I........ds
|
Storm Drains | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum repolaced 4 in. with 6 in as required..........ds
|
Storm Drains | 3/20/2018 | 3/21/2018 | 3/21/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum ok to cover drive thru area.........need to change out section that reduces from 6 in to 4 in and back to 6 in. all piping to remain 6 in. .....cannot reduce sizing..........ds
|
Storm Drains | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | FAIL |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum sched 40 piping required in portico under roof section by code..........ds
|
PLM-Aging Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | PEND |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 10/27/2017 | 10/30/2017 | 10/30/2017 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum west side and west front storm drains ok for cover...ds
|
Water and/or Sewer | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | NR |
Daryl Spivey
|
|
|
Storm Drain Phone #: ###-#### Inspection requested via web by Katherine Creekbaum
|
Water and/or Sewer | 10/2/2017 | 10/4/2017 | 10/4/2017 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum need to install vent down stream of interceptor..........and test interceptor........ds
|
Water and/or Sewer | 9/21/2017 | 9/22/2017 | 9/22/2017 | P | NR |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum
|
Water and/or Sewer | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | CANC |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Katherine Creekbaum wrong job called in for water service................ds
|
Application received | | | 5/3/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/3/2017 | | DONE |
|
|
|
|
First Notice | 6/18/2018 | 6/18/2018 | | | |
Daryl Spivey
|
|
|
|