PLM-Aging Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Dan Ediger
|
|
|
|
Other | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Dan Ediger
|
|
|
Back flow inspection Phone #: ###-#### Inspection requested via web by Steve Searle. OK to cover at the meter. Need to verify the connection at the existing house. Was part of the new water service and the existing pvb was reconnected to the new water service by the landscaper and not inspected. The existing pvc needs certified.
|
Issue PAID IN FULL permit | | | 6/20/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/20/2017 | | DONE |
|
|
|
This permit was created on the web by Steve Searle
|