Final | 10/11/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Eric Strole
|
|
|
Grease Interceptor gasketed lids have been installed as well as 48" ring and lid for lift station behind auto body shop. Request Final Inspection. Phone #: ###-#### Inspection requested via web by Taylor Landa
|
Water and/or Sewer | 8/18/2017 | 8/21/2017 | 8/21/2017 | P | CANC |
Eric Strole
|
|
|
Scheduling for Final Inspection at 3:00 pm. Phone #: ###-#### Inspection requested via web by Taylor Landa
|
Water and/or Sewer | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | PART |
Eric Strole
|
|
|
Baffels are installed in interceptor, need gasketed lids and sewer from bathrooms tie-in.
|
Water and/or Sewer | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | NR |
Eric Strole
|
|
|
Inspection of Sewer Lift Station Pumps. Phone #: ###-#### Inspection requested via web by Taylor Landa
|
Water and/or Sewer | 8/4/2017 | 8/7/2017 | 8/7/2017 | P | PART |
Eric Strole
|
|
|
We are planning on pressure testing the 1.25" pressure sewer line at 1:00 pm. Phone #: ###-#### Inspection requested via web by Taylor Landa-Test on pressure sewers pass.
|
Water and/or Sewer | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | PART |
Eric Strole
|
|
|
Test on interceptor pass and upstream and downstream piping. Still need tie-in to lift station and pressure line on this system of two.
|
Water and/or Sewer | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Taylor Landa-Start of 24 hr test on interceptor.
|
Storm Drains | 8/3/2017 | 8/4/2017 | 8/3/2017 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Taylor Landa
|
Other | 7/25/2017 | 7/31/2017 | 7/31/2017 | A | DONE |
Eric Strole
|
|
|
Onsite Pre-Construction Meeting scheduled with Eric Stole at 8:00 a.m. Phone #: ###-#### Inspection requested via web by Taylor Landa-Pre-construction meeting. Per Rick with public works the truck wash building will have a fuel intercepor with a valve before that when not washing trucks will divert rain water to the old septic system system and not alow storm water into the new pressure sewer system.
|
Issue PAID IN FULL permit | | | 7/25/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/25/2017 | | |
|
|
|
|
Application received | | | 7/25/2017 | | DONE |
|
|
|
This permit was created on the web by Taylor Landa
|
First Notice | 10/12/2017 | 10/12/2017 | | | |
Eric Strole
|
|
|
|