Final | 8/7/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Dan Ediger
|
|
|
|
Other | 8/5/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Dan Ediger
|
|
|
Install transition coupling on sewer connection. Picture sent on Saturday. Thanks! Phone #: ###-#### Inspection requested via web by Troy Woolston
|
Other | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | FAIL |
Dan Ediger
|
|
|
Homeowner will be home. Knock on the door. The crawl access is in the closet to the left of the front door. We capped off the septic sewer pipe and ran the building drain over to the stubben on .the south side of the crawl space. Inspection requested via web by Troy Woolston. The abs to pvc transition must be done with an approved transition band. ABS or transition glue are not approved
|
Miscellaneous action | | | 8/4/2017 | | DONE |
|
|
|
*****as per Rachael-ok on there end*******emailed Rachael in PW to see if the customer need to contact PW for sewer fees
|
Issue PAID IN FULL permit | | | 8/3/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/3/2017 | | DONE |
|
|
|
This permit was created on the web by Troy Woolston
|