First Notice | 11/1/2017 | 11/1/2017 | 3/30/2018 | | DONE |
Dan Ediger
|
|
|
|
Final | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Dan Ediger
|
|
|
|
Final | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams. Pipe the RP air gap drain 1", full size to the outdoors. It is reduced to 1/2"
|
Final | 10/30/2017 | 10/31/2017 | 10/31/2017 | P | FAIL |
Dan Ediger
|
|
|
Will not be available till afternoon Phone #: ###-#### Inspection requested via web by Jason Adams. The access needs to be large enough to remove the backflow assembly without cutting the sheetrock. Add a shut-off valve and union upstream of the backflow.
|
Final | 10/26/2017 | 10/27/2017 | 10/27/2017 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams. 1. Install a tempering valve on the water heater or all public sinks. 2. The t&p on the water heater is backgrading. 3. The backflow needs to be cerified. 4. The access to the backflow must be big enough to get to the unions for removal and service.
|
Plumbing Rough-in | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Dan Ediger
|
|
|
Brett Phone #: ###-####
|
Plumbing Rough-in | 8/25/2017 | 8/28/2017 | 8/28/2017 | P | FAIL |
Dan Ediger
|
|
|
Fred Phone #: ###-####. Run a 3/4" water line direct off a 1" line.
|
Other | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Dan Ediger
|
|
|
Please call ahead to meet, questions on how to test line - Conference - Fred Phone #: ###-####. Remove enough concrete to get a full size end of line cleanout installed and roll vent off the center line of the drain
|
Issue PAID IN FULL permit | | | 8/14/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 8/14/2017 | | |
|
|
|
|
Application received | | | 8/14/2017 | | DONE |
|
|
|
This permit was created on the web by Jason Adams
|